Software development plan basics
Software development plan will serve as the backbone of the entire project from start to finish, it must contain as much valuable information as possible. The purpose here is to outline the entire plan for developing, modifying, or upgrading the software while detailing how each step during the SDLC should be approached.
Scope of tasks to be performed during development.
Schedule of the above tasks and project deadline.
Task completion sequence and priority levels.
Software development life cycle
Assessment and planning
A preliminary estimate of the software development plan is prepared. If the client is satisfied, the final details are fine-tuned and the software requirements specification phase can begin.
Software requirements specification
We often mistakenly believe that the work of a business analyst ends after all project related documents are prepared and software development begins. This can be true if there are no changes during development, but since this happens very rarely, our team follows the project from start to finish.
Design
The design team is actively interacting with the business analyst. Together they design a product based on the aforementioned set of elements. Clients can have a proposal prepared before contacting us, or they can start from scratch.
Development
While working on the client side of the UI, the frontend team prepares the project for the backend developers. The job of the backend team is to implement the logical elements of the software. In other words, these are all processes that happen outside of the user’s browser and computer. The backend includes things like the admin panel, data management, and data transfers.
Quality assurance
Testing is essential to ensure that all elements of the software work as expected. QA engineers check compliance with design, technical specifications, prepare test documentation, perform manual and automated testing. All this is necessary to check the status of vario